Plug and Abandonment – BiSN completes inaugural North Sea project

BiSN, the global leader in innovative downhole sealing solutions, has successfully completed its first project in the North Sea using plug and abandonment.

The Plug and Abandonment (P&A) work in the Valhall Field for Aker BP involved using modified thermite heaters. This unique downhole technology reduces the heating time required to create gas-tight seals from hours to minutes; the heaters eliminate the need for special wireline equipment, or restriction on deployment depth, as they are designed to be run on standard wireline. With a wireline go-pin top connection, the technology requires 240V and 60 mA for 15 seconds (conventional wireline set tools), to activate the thermite chemical reaction heater.

During the well abandonment phase of multiple wells in the field, standard zonal isolation resulted in surface tubing pressure issues. To resolve this, BiSN set a Wel-lok™ TS (Tubing Seal) in the liner to isolate the producing zone.

The tool was set by activating the thermite chemical reaction heater, melting the bismuth alloy on the outside of the tool, allowing it to fill the inside of the liner. When solidified, the alloy expanded, creating a gas tight plug in the liner and isolating the non-permeable zone. After setting the tools in multiple wells, each well resulted in the elimination of surface liner pressure.

Paul Carragher, Chief Executive Officer of BiSN, said: “This project demonstrates how BiSN is able to assist operators in resolving downhole challenges, adding value to their operations whilst creating both cost and time-savings.

“This was achieved through the application of our innovative Wel-lok™ technology, which removes the need for specialist wireline equipment and any restrictions on deployment depth. Having deployed our technology across the globe, we are delighted to now implement its benefits within the North Sea.

“We now have an established relationship with Aker BP and are looking forward to working together again in the near future.”.

It is an exciting time for the company, particularly after its recent announcement of an investment agreement worth £5m with corporate venture capital groups BP Ventures, Schlumberger Ventures and GE Ventures.

The agreement will involve BiSN and BP Ventures working together to develop a commercial portfolio of technology, which will be applied across BP’s conventional, unconventional and deepwater portfolio.

Get in touch to find a permanent solution for your well

Businesses worldwide are benefitting from BiSN's well services in the field. Contact us today and embrace tomorrow's downhole well solution, today.

This is a required field
Please enter a valid email
This is a required field
There has been an error. Please try again.
There has been an error. Please try again.
This is a required field

Don’t miss out on the latest technical updates and advancements. Subscribe today.

Please enter a valid email address.

Our website uses analytics, marketing and preference cookies to both provide the most relevant experience for our users and to give us information about how our site is used. By clicking “Accept All”, you consent to the use of these cookies. However, you may visit "Cookie Settings" to provide a controlled consent.

Accept All Cookies