Case Studies

Filter by
Canada P&A - BiSN

Repairing Damaged Cement for an Operator in Canada

Brunei First in Country Run by BiSN

Reducing water cut for a Supermajor Operator in Brunei

Repairing a Production Packer for a Supermajor Operator in Alaska 

Papua New Guinea BiSN Case Study

Setting a Tubing Seal for permanent abandonment for Papua New Guinea operator

Repairing a production casing leak for a Canadian operator

Rigless Production Packer Repair in water injection wells in the Middle East

Sealing Multiple Annuli out to 20” to eliminate gas pressure in Permanent Abandonment for Offshore Israel Operator

First rigless P&A in Gulf of Mexico offshore without section milling. Stopped gas migration in the annulus using V0 qualified seal

Successful High Expansion Water Shut Off Deployment for Major Operator in Oman

BiSN Case Study - Offshore

Successful Shut Off of Multi-Annuli Gas Migration for Permanent Abandonment in Offshore California

Increasing Well Production and Operating Life For Super Major in Malaysia

Successful High Pressure/High Temperature Sand Control Failure Mitigation

BiSN deploys tomorrow's technology, today, on an offshore rig

World’s First Rigless Production Packer Remediation and Return-to-Service

Sustained Casing Pressure (Bradenhead) successfully eliminated in DJ Basin new drill wells

Sustained Casing Pressure and Gas Bubbles Successfully Eliminated in Permian Basin Well Abandonment (P&A)

Eliminating Gas Migration in Cemented Annuli

Proactively Addressing Bradenhead Pressure in the DJ Basin

Improving Steam Injection in California

Sealing Multiple Annuli During Well Abandonment in Offshore Australia

Eliminating Gas Migration During Well Abandonment in Offshore Australia

Addressing Bradenhead Pressure during Well Construction in the DJ Basin

Water Shut Off from a TLP in Offshore Angola

Water Shut Off from a LWIV in Offshore Angola

Water Shut Off Application in UK North Sea

Eliminating Gas Migration on a Remote Island in Australia

Eliminating Bradenhead Pressure in the DJ Basin

Surface Plug for Well Abandonment in Norway North Sea

Zonal Isolation Plug Application in Azerbaijan

Water Shut Off Application in Algeria

P&A Application in Norway North Sea

Field Trial in South Texas

P&A Application in Canada

Suspension Plug Application in UK North Sea

P&A Application in Norway North Sea

P&A Application in Norway North Sea

P&A Application in Norway North Sea

Field Trial Alaska

Field Trial Angola

Field Trial Gulf of Mexico

Repair of Leaking DV Tool West Texas (Permian Basin)

Get in touch and find a
permanent solution for your well

Businesses worldwide are benefitting from BiSN's well services in the field. Contact us today and embrace tomorrow's downhole well solution, today.

This is a required field
This is a required field
Please enter a valid email
This is a required field
This is a required field

Don’t miss out on the latest technical updates and advancements. Subscribe today.

Please enter a valid email address.

Our website uses analytics, marketing and preference cookies to both provide the most relevant experience for our users and to give us information about how our site is used. By clicking “Accept All”, you consent to the use of these cookies. However, you may visit "Cookie Settings" to provide a controlled consent.

Accept All Cookies